| |
|
|
|
|
| |
|
|
|
|
|
|
Embassies and
Peace Keeping Forces |
|
|
|
United
States Embassy, Awkar Faraday
cage lightning protection and surge arrestors for the compound
(1998) Security infrastructure rehabilitation (1999 and 2000)
Maintenance contracts for lightning protection and surge arrestors
throughout 2001, 2002, 2003. |
|
 |
Spanish Embassy
Rehabilitation of power Architectural and landscaping lighting. |
|
 |
Chancellerie Suisse
(SWISS EMBASSY), Borj El Ghazal Turnkey power,
lighting, low current, security and data cabling. |
|
 |
Ambassade
de France (French Embassy)
-
1st Contract: General
electromechanical maintenance for the French properties in
Lebanon comprising H.E. Residence des Pins, Consulate, Economic
Expansion. PEE, AFD, Centre Culturel Français, IFPO,
Mission Culturelle, Logements, etc. (5 years, 1999-2003 inclusive)
-
2nd Contract: supply and
installation of a new power plant 2 x 500 KVA with MDB’s for Espace
des Lettres and the new Embassy |
|
 |
Brazilian Embassy
-
Rehabilitation of Water supply/ Water
treatment room, Boilers room, Rehabilitation of Genset Control,
plumbing rehabilitation for the whole residence.
-
Thermal isolation of pipes/Energy saving. |
|
 |
Korean Embassy ATS
installation, Maintenance works. |
|
 |
United Nations Interim
Forces In Lebanon (UNIFIL)
Naqoura HQ Power house 5 x 1000 KVA Generators,
Synchronized, Remote monitored, remote controlled along with online
Power and Energy recording system for historical power analysis. |
 |
|
|
|
|
|
|
|
|
|
|
|